Solar Engineering Insights

Permit guides, code compliance, and best practices from our engineering team. Updated weekly with real-world solar project insights.

Structural engineer inspecting roof trusses in an attic with a tablet

Why Solar Permits Now Require a Roof Structural Letter

More AHJs won't approve a permit on racking calcs alone anymore — they want a separate stamped letter confirming the existing roof framing can carry the added load. What it covers, and where it's showing up most.

Read article
Solar permit blueprint stamped rejected

Top 10 Solar Permit Rejection Reasons (And How to Fix Them)

From missing PE stamps to rapid shutdown gaps to AHJ-specific checklist misses — the ten issues that send a plan set back for resubmission, and how to avoid each one.

Read article
Engineer's desk with a project map and solar permit blueprints

Case Studies: Real Solar Permit & Interconnection Projects

A Puerto Rico battery install navigating OGPe and LUMA, a 240 kW California commercial array, and a 2-day Texas residential Powerwall job — real project codes and turnaround times.

Read article
Two stacks of documents comparing solar permit pricing

EnersolConnect vs. Solar Permit Solutions: Pricing & Feature Comparison

A line-by-line comparison of price, turnaround, and what's actually included between the two — real numbers, not marketing copy.

Read article
Homeowner installing solar panels on their own roof

Can You Get a Solar Permit Without an Installer? A DIY Homeowner's Guide

Yes — your AHJ requires a code-compliant, PE-stamped plan set, not proof you hired a full-service installer. Here's exactly what that means if you're self-installing.

Read article
Homeowner and solar installer reviewing plans together

DIY vs. Installer: Which Solar Permit Path Is Right for You?

Fully self-installing, or hired an installer who doesn't stamp plans? A quick decision framework for which situation you're actually in.

Read article
Map of the United States with solar panel icons

How to Get a Solar Permit: Complete State-by-State Guide

Navigate the permit process for residential and commercial solar installations across all 50 states. Requirements, timelines, and common pitfalls.

Read article
Engineer stamping a solar structural blueprint

PE Stamp Requirements by State: 2026 Updated Guide

Which states require professional engineer stamps for solar installations? Complete breakdown of PE requirements, exemptions, and typical costs.

Read article
Electrician working at a utility interconnection meter panel

Utility Interconnection Process: What Contractors Need to Know

Master the interconnection process for PG&E, SCE, SDG&E, and other major utilities. Timeline expectations, common rejection reasons, and how to expedite approval.

Read article